Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 3 · Mark Mounting Points on Wall

Measure the distance between the hanging points (e.g., D-rings, wire) on the back of the mirror. Transfer these measurements to the wall at the desired height, ensuring they are perfectly level. If using a French cleat, mark the position of the wall-mounted cleat. Use a level to ensure all marks are accurately aligned horizontally. If mounting into studs, mark the center of the studs. For anchors, mark the exact locations specified by the anchor's instructions.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 3 · Mark Mounting Points on Wall

Measure the distance between the hanging points (e.g., D-rings, wire) on the back of the mirror. Transfer these measurements to the wall at the desired height, ensuring they are perfectly level. If using a French cleat, mark the position of the wall-mounted cleat. Use a level to ensure all marks are accurately aligned horizontally. If mounting into studs, mark the center of the studs. For anchors, mark the exact locations specified by the anchor's instructions.

Videos for this step

Mark and Drill Wall for AnchorsMeasure & Mark Wall PlacementMark Hook Installation Points on Wall

Tools and Materials

← Project

How to Hang a Large Mirror on a Stair Landing

Step 3 of 7·1.3 hr left

Assess Stair Landing Wall
15 minutes4 items
Determine Mirror Hanging Hardware
20 minutes7 items
3
Mark Mounting Points on Wall
15 minutes5 items
4
Install Wall Anchors or Mounts
25 minutes6 items
5
Attach Mirror Hanging Hardware
20 minutes6 items
6
Hang the Mirror
10 minutes2 items
7
Final Inspection and Cleanup
10 minutes3 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.