Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 7 · Allow Second Coat to Dry and Sand

Allow the second coat of joint compound to dry completely, similar to the first coat. Once dry, lightly sand the area smooth with fine-grit sandpaper. Feather the edges carefully and wipe away all dust with a dry cloth or tack cloth.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 7 · Allow Second Coat to Dry and Sand

Allow the second coat of joint compound to dry completely, similar to the first coat. Once dry, lightly sand the area smooth with fine-grit sandpaper. Feather the edges carefully and wipe away all dust with a dry cloth or tack cloth.

Videos for this step

Second Compound CoatSecond Compound CoatSand and Clean Second Coat of Joint Compound

Tools and Materials

← Project

Drywall Patch

Step 7 of 9·4.8 hr left

Clean the Damaged Area
5 minutes2 items
Apply Drywall Patch
3 minutes1 items
Apply First Coat of Joint Compound
10 minutes1 items
Allow Compound to Dry
240 minutes
Sand the Dried Compound
10 minutes2 items
Apply Second Coat of Joint Compound
10 minutes1 items
7
Allow Second Coat to Dry and Sand
250 minutes2 items
8
Prime the Repaired Area
15 minutes2 items
9
Paint the Repaired Area
20 minutes2 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.