Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 6 · Apply Second Coat of Joint Compound

Apply a second thin coat of joint compound over the patched area, extending slightly beyond the edges of the first coat. Use the putty knife to spread it evenly and feather the edges to blend seamlessly with the wall. This coat helps to further smooth the repair.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 6 · Apply Second Coat of Joint Compound

Apply a second thin coat of joint compound over the patched area, extending slightly beyond the edges of the first coat. Use the putty knife to spread it evenly and feather the edges to blend seamlessly with the wall. This coat helps to further smooth the repair.

Videos for this step

Second CoatApply Skim CoatSecond Coat and Smoothing

Tools and Materials

← Project

Drywall Patch

Step 6 of 9·4.9 hr left

Clean the Damaged Area
5 minutes2 items
Apply Drywall Patch
3 minutes1 items
Apply First Coat of Joint Compound
10 minutes1 items
Allow Compound to Dry
240 minutes
Sand the Dried Compound
10 minutes2 items
6
Apply Second Coat of Joint Compound
10 minutes1 items
7
Allow Second Coat to Dry and Sand
250 minutes2 items
8
Prime the Repaired Area
15 minutes2 items
9
Paint the Repaired Area
20 minutes2 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.