Step 3 · Apply First Coat of Joint Compound

Using a putty knife, scoop a small amount of joint compound. Apply it over the drywall patch, spreading it outwards in thin, even strokes. Feather the edges so the compound gradually blends into the existing wall surface. Aim for a smooth, consistent layer.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 3 · Apply First Coat of Joint Compound

Using a putty knife, scoop a small amount of joint compound. Apply it over the drywall patch, spreading it outwards in thin, even strokes. Feather the edges so the compound gradually blends into the existing wall surface. Aim for a smooth, consistent layer.

Videos for this step

Apply Joint CompoundFirst Coat ApplicationDrywall Compound Application

Tools and Materials

← Project

Drywall Patch

Step 3 of 9·9.3 hr left

Clean the Damaged Area
5 minutes2 items
Apply Drywall Patch
3 minutes1 items
3
Apply First Coat of Joint Compound
10 minutes1 items
4
Allow Compound to Dry
240 minutes
5
Sand the Dried Compound
10 minutes2 items
6
Apply Second Coat of Joint Compound
10 minutes1 items
7
Allow Second Coat to Dry and Sand
250 minutes2 items
8
Prime the Repaired Area
15 minutes2 items
9
Paint the Repaired Area
20 minutes2 items