Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings
Project video

Step 10 · Turn On Water Supply and Test

Slowly open the hot and cold water shut-off valves under the sink by turning them counter-clockwise. Turn the faucet on and off several times, checking carefully around the handle and spout for any drips or leaks. Ensure the water flows correctly and the initial drip has stopped.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 10 · Turn On Water Supply and Test

Slowly open the hot and cold water shut-off valves under the sink by turning them counter-clockwise. Turn the faucet on and off several times, checking carefully around the handle and spout for any drips or leaks. Ensure the water flows correctly and the initial drip has stopped.

← Project

Dripping Faucet Repair

Step 10 of 10·5 min left

Turn Off Water Supply
5 minutes
Drain Residual Water
2 minutes
Identify Faucet Type
5 minutes
Disassemble Faucet Handle(s)
10 minutes
Remove Faucet Components
15 minutes
Inspect and Replace Worn Parts
20 minutes
Clean Faucet Interior
10 minutes
Reassemble Faucet
15 minutes
Reattach Faucet Handle(s)
5 minutes
10
Turn On Water Supply and Test
5 minutes
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.