Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 6 · Connect Power Supply and Test

Connect the input end of your first LED strip segment (or the end of the main run) to the power supply. This typically involves connecting a low-voltage wire from the power adapter to the appropriate input terminals on the LED strip, ensuring correct polarity (+ to +, - to -). If using a controller for dimming or color changes, wire the LED strip to the controller's output and the power supply to the controller's input. Plug in the power supply and test all segments of the LED strip to ensure they light up correctly and consistently. Check for any flickering or dead sections.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 6 · Connect Power Supply and Test

Connect the input end of your first LED strip segment (or the end of the main run) to the power supply. This typically involves connecting a low-voltage wire from the power adapter to the appropriate input terminals on the LED strip, ensuring correct polarity (+ to +, - to -). If using a controller for dimming or color changes, wire the LED strip to the controller's output and the power supply to the controller's input. Plug in the power supply and test all segments of the LED strip to ensure they light up correctly and consistently. Check for any flickering or dead sections.

Videos for this step

Connect Power Supply and TestWiring and Power ConnectionPower Up and Test

Tools and Materials

← Project

How to Cut and Join LED Strip Lights Around Stair Corners

Step 6 of 7·1.1 hr left

Plan LED Strip Layout
30 minutes3 items
Cut LED Strips to Length
15 minutes2 items
Prepare LED Strip Ends for Connection
20 minutes3 items
Join LED Strips (if necessary)
45 minutes7 items
Mount LED Strips to Stairs
30 minutes5 items
6
Connect Power Supply and Test
40 minutes4 items
7
Secure and Conceal Wiring
25 minutes3 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.