Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 4 · Install Treads

Place the cut treads onto the horizontal supports of the stringers. Ensure they are flush with the front edge of the stringer (or have a slight overhang, typically 1 inch). Secure each tread by driving screws through the tread and into the stringer. Use at least two screws per stringer per tread for stability. If using pressure-treated lumber for treads, pre-drilling pilot holes can prevent splitting.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Install Treads

Place the cut treads onto the horizontal supports of the stringers. Ensure they are flush with the front edge of the stringer (or have a slight overhang, typically 1 inch). Secure each tread by driving screws through the tread and into the stringer. Use at least two screws per stringer per tread for stability. If using pressure-treated lumber for treads, pre-drilling pilot holes can prevent splitting.

Videos for this step

Install Wooden TreadsInstall Stair TreadsAttach Treads and Risers

Tools and Materials

← Project

How to Build Stairs for a Shed or Mobile Home

Step 4 of 7·5.3 hr left

Determine Stair Dimensions
60 minutes3 items
Cut Stringers
120 minutes5 items
Attach Stringers to Shed
45 minutes3 items
4
Install Treads
90 minutes4 items
5
Install Risers (Optional)
60 minutes3 items
6
Attach Stringers to Ground/Landing
45 minutes3 items
7
Install Handrails and Balusters (if required)
120 minutes4 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.