Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 5 · Secure and Tidy Up

Double-check that the control device is firmly attached and that all wire connections are fully enclosed within their respective electrical boxes. Secure any cover plates or access panels. Dispose of any scrap materials and tools properly. Ensure the area around the stair lights and electrical panel is clear and safe.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 5 · Secure and Tidy Up

Double-check that the control device is firmly attached and that all wire connections are fully enclosed within their respective electrical boxes. Secure any cover plates or access panels. Dispose of any scrap materials and tools properly. Ensure the area around the stair lights and electrical panel is clear and safe.

Videos for this step

Test and Finalize InstallationInsert Lights and Initial Power TestConceal and Finish

Tools and Materials

← Project

How to Add a Dusk-To-Dawn or Timer Control to Stair Lights

Step 5 of 5·10 min left

Turn Off Power
10 minutes3 items
Install the Control Sensor/Timer
60 minutes6 items
Connect Control Device to Stair Lights
45 minutes4 items
Test the System
15 minutes2 items
5
Secure and Tidy Up
10 minutes2 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.