Step 4 · Test the System

Once all connections are made and secured, and the control device is mounted, return to the main electrical panel and turn the circuit breaker back to the 'ON' position. For a dusk-to-dawn sensor, cover the sensor with an opaque material or wait until dusk to see if the lights turn on. For a timer, check if the lights turn on/off according to its programmed schedule. Manually override the system if possible to test both 'on' and 'off' states.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Test the System

Once all connections are made and secured, and the control device is mounted, return to the main electrical panel and turn the circuit breaker back to the 'ON' position. For a dusk-to-dawn sensor, cover the sensor with an opaque material or wait until dusk to see if the lights turn on. For a timer, check if the lights turn on/off according to its programmed schedule. Manually override the system if possible to test both 'on' and 'off' states.

Videos for this step

Restore Power and Test SensorTest and Finalize InstallationTest Photocell Functionality

Tools and Materials

← Project

How to Add a Dusk-To-Dawn or Timer Control to Stair Lights

Step 4 of 5·25 min left

Turn Off Power
10 minutes3 items
Install the Control Sensor/Timer
60 minutes6 items
Connect Control Device to Stair Lights
45 minutes4 items
4
Test the System
15 minutes2 items
5
Secure and Tidy Up
10 minutes2 items