Site Assessment and Initial Clearing — Plan the Step Location and Dimensions
Part of project
How to Build Backyard Steps with Railroad Ties or Landscape Timbers · Step 1 of 7
In this video
Begin by assessing the embankment where the steps will be built. Use a long straight edge (e.g., a long spirit level or a string line) and a peg to mark the landing point for the top step. Measure the total 'run' (horizontal distance) from the top landing point to the base of the embankment and the 'rise' (vertical height) to determine the number and depth of steps required. In this project, the overall run was 255 inches and the overall rise was 92 inches. Before starting construction, clear any existing hardcore, debris, or vegetation from the area. A tipper truck can be used to efficiently remove larger quantities of material.
TranscriptHide
Auto-generated transcript. May contain errors.
Site Assessment and Initial Clearing — Plan the Step Location and Dimensions
Part of project
How to Build Backyard Steps with Railroad Ties or Landscape Timbers · Step 1 of 7
In this video
Begin by assessing the embankment where the steps will be built. Use a long straight edge (e.g., a long spirit level or a string line) and a peg to mark the landing point for the top step. Measure the total 'run' (horizontal distance) from the top landing point to the base of the embankment and the 'rise' (vertical height) to determine the number and depth of steps required. In this project, the overall run was 255 inches and the overall rise was 92 inches. Before starting construction, clear any existing hardcore, debris, or vegetation from the area. A tipper truck can be used to efficiently remove larger quantities of material.
Video Transcript
(706 characters)Hide
Video Transcript
(706 characters)Transcript may be auto-generated and contain errors.