Skip to main content

Install Top and Bottom Rails — Cut and Attach Top Rail

Beginner8 hours

Part of project

How to Add a Railing to Two or Three Porch Steps · Step 3 of 6

Helpful?

In this video

Measure the exact distance between each installed rail post. Cut 2x4 lumber to create your top and bottom rails, ensuring they fit snugly between the posts. When installing the bottom rail, allow for a 3 1/2-inch sweep space between the bottom edge of the rail and the deck surface. Attach each end of the rails to the posts using four 3 1/2-inch trim screws, driven in diagonally for enhanced strength and stability.

592.6K views705