Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 1 · Determine Post Placement

Measure and mark the exact positions where the railing posts will be installed. Typically, a post is placed at the top landing and another at the bottom of the steps. If the steps are particularly wide, an intermediate post may be necessary for adequate support. Use a level to ensure the marks are perfectly vertical (plumb). The spacing between posts should align with the railing design and local building codes, generally not exceeding 6 feet.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 1 · Determine Post Placement

Measure and mark the exact positions where the railing posts will be installed. Typically, a post is placed at the top landing and another at the bottom of the steps. If the steps are particularly wide, an intermediate post may be necessary for adequate support. Use a level to ensure the marks are perfectly vertical (plumb). The spacing between posts should align with the railing design and local building codes, generally not exceeding 6 feet.

Videos for this step

Determine Post SpacingPlan Post Placement and Gather ToolsCalculate and Mark Intermediate Post Placement

Tools and Materials

← Project

How to Add a Railing to Two or Three Porch Steps

Step 1 of 6·8.5 hr left

1
Determine Post Placement
30 minutes4 items
2
Install Newel Posts
120 minutes7 items
3
Cut and Attach Top Rail
60 minutes5 items
4
Install Balusters or Spindles
180 minutes6 items
5
Install Handrail
75 minutes5 items
6
Final Inspection and Finishing Touches
45 minutes6 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.