Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings
Project video

Step 6 · Check Operation and Re-inspect

Open and close the window several times to ensure the weatherstripping and caulk have not obstructed its movement. Allow the caulk to cure according to the manufacturer's instructions. Once cured, perform another draft inspection, using the smoke pencil or by feeling for air movement, to confirm the effectiveness of your sealing efforts.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 6 · Check Operation and Re-inspect

Open and close the window several times to ensure the weatherstripping and caulk have not obstructed its movement. Allow the caulk to cure according to the manufacturer's instructions. Once cured, perform another draft inspection, using the smoke pencil or by feeling for air movement, to confirm the effectiveness of your sealing efforts.

← Project

Window Sealing

Step 6 of 6·15 min left

Inspect for Drafts
30 minutes
Clean the Area
15 minutes
Apply Caulk
45 minutes
Install Weatherstripping
30 minutes
Apply Window Film
30 minutes
6
Check Operation and Re-inspect
15 minutes
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.