Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings
Project video

Step 1 · Mark Hole Locations

Hold one of the mounting brackets against the wall at the desired height and position. Use a pencil to mark the center of the screw holes through the bracket onto the tile. Repeat for the second bracket, ensuring it is level with the first.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 1 · Mark Hole Locations

Hold one of the mounting brackets against the wall at the desired height and position. Use a pencil to mark the center of the screw holes through the bracket onto the tile. Repeat for the second bracket, ensuring it is level with the first.

← Project

Towel Bar Installation

Step 1 of 5·40 min left

1
Mark Hole Locations
5 minutes
2
Drill Pilot Holes in Tile
15 minutes
3
Insert Wall Anchors
5 minutes
4
Attach Mounting Brackets
10 minutes
5
Mount Towel Bar
5 minutes
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.