Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 1 · Measure for a Perfect Fit

Begin by carefully measuring the width of your current stair tread from one side to the other. Next, measure the depth from the front edge—what we call the 'nosing'—to the very back where it meets the riser. It's also crucial to note the depth of any existing overhang. These precise measurements are your blueprint for success.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 1 · Measure for a Perfect Fit

Begin by carefully measuring the width of your current stair tread from one side to the other. Next, measure the depth from the front edge—what we call the 'nosing'—to the very back where it meets the riser. It's also crucial to note the depth of any existing overhang. These precise measurements are your blueprint for success.

Videos for this step

Measure Treads and Mark LaminateMeasure and Mark Tread and NosingMeasure and Mark Treads

← Project

Stair Tread Installation

Step 1 of 8·3.3 hr left

1
Measure for a Perfect Fit
15 minutes
2
Create a Template for Precision (Optional but Recommended)
30 minutes
3
Inspect and Prepare Your New Tread
45 minutes1 items
4
Perform a 'Dry Fit' Test
20 minutes1 items
5
Apply Your Construction Adhesive
25 minutes
6
Set Your New Tread in Place
15 minutes1 items
7
Reinforce for Maximum Stability (Optional but Recommended)
30 minutes
8
Add the Finishing Touches
15 minutes
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.