Step 4 · Pump Septic Tank

Insert the vacuum hose into the septic tank, typically through the largest opening. Start the vacuum pump and allow it to draw out the contents. Move the hose around to ensure all solids and liquids are removed from the bottom of the tank. Continue pumping until no more waste can be extracted.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Pump Septic Tank

Insert the vacuum hose into the septic tank, typically through the largest opening. Start the vacuum pump and allow it to draw out the contents. Move the hose around to ensure all solids and liquids are removed from the bottom of the tank. Continue pumping until no more waste can be extracted.

Videos for this step

Pump Down Inlet Sidepump out septic tankPumping and Rinsing

Tools and Materials

← Project

Septic Tank Pumping

Step 4 of 9·3.8 hr left

Assess Septic Tank
30 minutes3 items
Prepare Pumping Equipment
45 minutes3 items
Open Septic Tank Lid
15 minutes3 items
4
Pump Septic Tank
60 minutes3 items
5
Inspect Tank Interior
20 minutes2 items
6
Clean Tank Openings
10 minutes2 items
7
Close Septic Tank Lid
15 minutes2 items
8
Dispose of Waste
90 minutes2 items
9
Clean Up Equipment
30 minutes3 items