Step 2 · Prepare Pumping Equipment

Position the vacuum truck in a location that allows for the shortest hose run to the septic tank. Unreel the vacuum hoses, checking for any cracks or damage. Connect the hoses to the truck's pump and ensure all valves are in the correct positions for suction.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 2 · Prepare Pumping Equipment

Position the vacuum truck in a location that allows for the shortest hose run to the septic tank. Unreel the vacuum hoses, checking for any cracks or damage. Connect the hoses to the truck's pump and ensure all valves are in the correct positions for suction.

Videos for this step

pump out septic tankPrepare Vacuum Pump for PumpingPump Down Inlet Side

Tools and Materials

← Project

Septic Tank Pumping

Step 2 of 9·4.8 hr left

Assess Septic Tank
30 minutes3 items
2
Prepare Pumping Equipment
45 minutes3 items
3
Open Septic Tank Lid
15 minutes3 items
4
Pump Septic Tank
60 minutes3 items
5
Inspect Tank Interior
20 minutes2 items
6
Clean Tank Openings
10 minutes2 items
7
Close Septic Tank Lid
15 minutes2 items
8
Dispose of Waste
90 minutes2 items
9
Clean Up Equipment
30 minutes3 items