Step 4 · Determine Baluster Placement and Spacing

Start by placing a baluster at each end of the railing (at the newel posts or mounting points). Then, divide the remaining length by the number of spaces calculated in Step 3. This will give you the desired distance between the centerlines of each baluster. Mark these points on the underside of the top rail and the edge of the tread or floor. You may need to slightly adjust the spacing to achieve an even look and comply with codes. Ensure that no opening exceeds the code's maximum.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Determine Baluster Placement and Spacing

Start by placing a baluster at each end of the railing (at the newel posts or mounting points). Then, divide the remaining length by the number of spaces calculated in Step 3. This will give you the desired distance between the centerlines of each baluster. Mark these points on the underside of the top rail and the edge of the tread or floor. You may need to slightly adjust the spacing to achieve an even look and comply with codes. Ensure that no opening exceeds the code's maximum.

Videos for this step

Confirm Railing Height and Baluster SpacingLayout and Mark Baluster SpacingMark Baluster Placement on Rails

Tools and Materials

← Project

How to Measure Baluster Spacing and Handrail Height

Step 4 of 7·3.1 hr left

Determine Baluster Spacing Code Requirements
30 minutes2 items
Measure Total Railing Length
15 minutes1 items
Calculate Number of Baluster Spaces
10 minutes
4
Determine Baluster Placement and Spacing
45 minutes4 items
5
Determine Handrail Height Requirements
20 minutes2 items
6
Install Balusters
90 minutes8 items
7
Final Inspection and Code Check
30 minutes2 items