Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 2 · Measure Total Railing Length

Using a measuring tape, accurately measure the total horizontal distance along the underside of the handrail from newel post to newel post, or from the end of one railing section to the start of another. For angled stair sections, measure the slope length of the handrail. Record this measurement precisely.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 2 · Measure Total Railing Length

Using a measuring tape, accurately measure the total horizontal distance along the underside of the handrail from newel post to newel post, or from the end of one railing section to the start of another. For angled stair sections, measure the slope length of the handrail. Record this measurement precisely.

Videos for this step

Measure Staircase Length and AnglePlan and Measure Stair Railing ComponentsMeasure and Cut Handrails to Length

Tools and Materials

← Project

How to Measure Baluster Spacing and Handrail Height

Step 2 of 7·3.5 hr left

Determine Baluster Spacing Code Requirements
30 minutes2 items
2
Measure Total Railing Length
15 minutes1 items
3
Calculate Number of Baluster Spaces
10 minutes
4
Determine Baluster Placement and Spacing
45 minutes4 items
5
Determine Handrail Height Requirements
20 minutes2 items
6
Install Balusters
90 minutes8 items
7
Final Inspection and Code Check
30 minutes2 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.