Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 3 · Position First Tread

Take the first carpet tread and align it with the front edge of the top stair. Ensure it is centered from side to side and sits flush with the nosing of the stair. This precise alignment is crucial for the appearance and fit of subsequent treads.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 3 · Position First Tread

Take the first carpet tread and align it with the front edge of the top stair. Ensure it is centered from side to side and sits flush with the nosing of the stair. This precise alignment is crucial for the appearance and fit of subsequent treads.

Videos for this step

Install First Stair TreadInstall First Stair TreadSecure Treads to Stairs

← Project

How to Install Carpet Treads on Steep Cottage or Attic Stairs

Step 3 of 7·1.4 hr left

Inspect Stairs
10 minutes1 items
Clean Stairs
60 minutes3 items
3
Position First Tread
5 minutes
4
Apply Adhesive (if necessary)
15 minutes2 items
5
Install First Tread
5 minutes1 items
6
Repeat for Remaining Treads
45 minutes1 items
7
Final Inspection and Cleanup
15 minutes2 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.