Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 5 · Secure Edges and Nosing

Pay special attention to the edges and the nosing of each installed carpet tread. Press down firmly along these areas to ensure a strong bond. If any part of the edge seems loose, apply additional pressure or a small amount of appropriate adhesive specifically to the edge and press it down.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 5 · Secure Edges and Nosing

Pay special attention to the edges and the nosing of each installed carpet tread. Press down firmly along these areas to ensure a strong bond. If any part of the edge seems loose, apply additional pressure or a small amount of appropriate adhesive specifically to the edge and press it down.

Videos for this step

Secure Treads to StairsPress Down FirmlyTuck and Staple Carpet Edges

Tools and Materials

← Project

How to Install Carpet Treads on High-Gloss Polyurethane Stairs

Step 5 of 5·5 min left

Clean Stair Treads
30 minutes2 items
Dry Fit Carpet Treads
15 minutes2 items
Apply Adhesive (if necessary)
20 minutes2 items
Install Carpet Tread
10 minutes1 items
5
Secure Edges and Nosing
5 minutes1 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.