Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 4 · Install Carpet Tread

Starting from the nosing of the stair tread, carefully peel away the protective backing from the carpet tread's adhesive. Align the tread with your previously determined dry-fit position. Press the tread down firmly, working from the back edge towards the front nosing, ensuring there are no air bubbles and that the tread is fully adhered to the stair surface.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Install Carpet Tread

Starting from the nosing of the stair tread, carefully peel away the protective backing from the carpet tread's adhesive. Align the tread with your previously determined dry-fit position. Press the tread down firmly, working from the back edge towards the front nosing, ensuring there are no air bubbles and that the tread is fully adhered to the stair surface.

Videos for this step

Install Carpet TreadsInstall Carpet Treads with AdhesiveApply Peel-and-Stick Carpet Treads

Tools and Materials

← Project

How to Install Carpet Treads on High-Gloss Polyurethane Stairs

Step 4 of 5·15 min left

Clean Stair Treads
30 minutes2 items
Dry Fit Carpet Treads
15 minutes2 items
Apply Adhesive (if necessary)
20 minutes2 items
4
Install Carpet Tread
10 minutes1 items
5
Secure Edges and Nosing
5 minutes1 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.