Step 7 · Install the Baseboard Molding

Once you are satisfied with the fit, begin the permanent installation. Apply a bead of construction adhesive to the back of each baseboard section. Then, press the molding firmly against the wall. For added security, use a nail gun with finishing nails to secure the baseboard to the wall studs. Drive the nails flush or slightly below the surface of the molding. Work from one end of the staircase to the other, ensuring each piece is aligned correctly.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 7 · Install the Baseboard Molding

Once you are satisfied with the fit, begin the permanent installation. Apply a bead of construction adhesive to the back of each baseboard section. Then, press the molding firmly against the wall. For added security, use a nail gun with finishing nails to secure the baseboard to the wall studs. Drive the nails flush or slightly below the surface of the molding. Work from one end of the staircase to the other, ensuring each piece is aligned correctly.

Videos for this step

Install BaseboardMark Stud Locations and Install BaseboardInstall Baseboards to the Wall

Tools and Materials

← Project

How to Install Baseboard Along a Staircase Wall

Step 7 of 9·4.2 hr left

Measure and Plan Baseboard Layout
60 minutes3 items
Acquire Baseboard Material
30 minutes1 items
Prepare the Wall Surface
20 minutes2 items
Make Initial Straight Cuts
45 minutes4 items
Cut Inside and Outside Corners
60 minutes3 items
Dry Fit and Adjust Cuts
45 minutes2 items
7
Install the Baseboard Molding
90 minutes4 items
8
Fill Nail Holes and Caulk Gaps
40 minutes6 items
9
Paint or Finish Baseboard
120 minutes6 items