Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 6 · Finish and Inspect

Sand the entire handrail assembly smooth, paying attention to the joints. Fill any screw holes or imperfections with wood filler and allow it to dry. Once dry, sand the filled areas flush. Apply stain, paint, or sealant to match the existing handrail and surrounding finishes. Inspect the entire installation for stability and appearance.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 6 · Finish and Inspect

Sand the entire handrail assembly smooth, paying attention to the joints. Fill any screw holes or imperfections with wood filler and allow it to dry. Once dry, sand the filled areas flush. Apply stain, paint, or sealant to match the existing handrail and surrounding finishes. Inspect the entire installation for stability and appearance.

Videos for this step

Final Sanding and CleaningFinishing and SealingFinishing Touches (Sanding, Finishing, Caulk)

Tools and Materials

← Project

How to Install a Handrail Return at the End of a Rail

Step 6 of 6·1 hr left

Mark Handrail Return Position
15 minutes2 items
Prepare Handrail End for Return
45 minutes3 items
Fit and Test Handrail Return
20 minutes2 items
Secure Handrail Return to Handrail
30 minutes6 items
Mount Handrail Assembly to Wall/Newel Post
30 minutes5 items
6
Finish and Inspect
60 minutes5 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.