Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 2 · Locate and Prepare the Cleanout

Locate the main sewer line cleanout. This is typically a 3- to 4-inch diameter pipe with a screw-on cap or plug. In this case, we are assuming it is located outside the house, close to the foundation. It may be at ground level or sticking up a few inches. Clear any dirt, grass, overgrown plants, or other debris from around the cleanout cap so you have a clean, safe working area and can get an unobstructed grip on the plug with your pipe wrench.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 2 · Locate and Prepare the Cleanout

Locate the main sewer line cleanout. This is typically a 3- to 4-inch diameter pipe with a screw-on cap or plug. In this case, we are assuming it is located outside the house, close to the foundation. It may be at ground level or sticking up a few inches. Clear any dirt, grass, overgrown plants, or other debris from around the cleanout cap so you have a clean, safe working area and can get an unobstructed grip on the plug with your pipe wrench.

Videos for this step

Prepare the cleanoutMain CleanoutInstall the New Cleanout Plug

Tools and Materials

← Project

How to Use a Main Line Cleanout to Clear a Major Sewer Clog

Step 2 of 8·2.3 hr left

Preparation and Safety
20 mins7 itemsIntermediate
2
Locate and Prepare the Cleanout
15 mins5 itemsBeginner
3
Open the Cleanout Plug
15 mins5 items
4
Insert the Auger Cable
10 mins5 itemsIntermediate
5
Operate the Motorized Auger
30 mins3 items
6
Work Through the Clog
30 mins4 items
7
Retrieve Cable and Test Drain
20 mins6 itemsAdvanced
8
Close Cleanout and Clean Up
20 mins5 itemsIntermediate
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.