Step 7 · Test for Leaks

The final step is to check your work for leaks. Ensure all faucets that you opened earlier are now fully closed. Go back to the main water shutoff valve and turn it on *very slowly*. Turning it on too fast can cause a 'water hammer' effect that can damage pipes and fittings. As you slowly open the valve, listen for the sound of pipes filling and for any abrupt hissing or spraying noises. Once the valve is fully open, return to your work area. Carefully and thoroughly inspect the new fittings on both the galvanized and PEX sides. Look for any signs of dripping or moisture. For a definitive check, wipe each connection point with a dry paper towel and then observe the paper towel for any damp spots. If all connections are dry after several minutes, open a nearby faucet to test flow and flush out any air or debris in the line. Your replacement is complete.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 7 · Test for Leaks

The final step is to check your work for leaks. Ensure all faucets that you opened earlier are now fully closed. Go back to the main water shutoff valve and turn it on *very slowly*. Turning it on too fast can cause a 'water hammer' effect that can damage pipes and fittings. As you slowly open the valve, listen for the sound of pipes filling and for any abrupt hissing or spraying noises. Once the valve is fully open, return to your work area. Carefully and thoroughly inspect the new fittings on both the galvanized and PEX sides. Look for any signs of dripping or moisture. For a definitive check, wipe each connection point with a dry paper towel and then observe the paper towel for any damp spots. If all connections are dry after several minutes, open a nearby faucet to test flow and flush out any air or debris in the line. Your replacement is complete.

Videos for this step

Test FaucetFinal Checks and FlushingTest for Leaks and Functionality

Tools and Materials

← Project

How to Replace a Section of Galvanized Pipe with PEX

Step 7 of 7·15 min left

Plan and Gather Materials
30 mins7 itemsIntermediate
Cut and Remove Old Pipe
30 mins6 items
Prepare Pipe Ends
15 mins3 itemsIntermediate
Install Transition Fittings
15 mins5 itemsAdvanced
Measure and Cut PEX
10 mins5 itemsBeginner
Connect PEX Section
10 mins2 itemsIntermediate
7
Test for Leaks
15 mins3 itemsBeginner