Step 3 · Prepare Pipe Ends

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

This step is crucial for ensuring a watertight seal. Inspect the cut ends of the remaining galvanized pipe. They will likely have sharp edges or burrs from the cutting process. Use a metal file or a dedicated pipe deburring tool to smooth the inside and outside edges of the pipe ends. Any sharp edge can damage the O-ring inside a push-to-connect fitting, leading to a failure. Once the edges are smooth, take a piece of emery cloth or medium-grit sandpaper and thoroughly clean the outer surface of the pipe, extending about 1-2 inches from the end. You need to remove all rust, paint, scale, and grime to create a smooth, clean surface for the fitting to seal against.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 3 · Prepare Pipe Ends

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

This step is crucial for ensuring a watertight seal. Inspect the cut ends of the remaining galvanized pipe. They will likely have sharp edges or burrs from the cutting process. Use a metal file or a dedicated pipe deburring tool to smooth the inside and outside edges of the pipe ends. Any sharp edge can damage the O-ring inside a push-to-connect fitting, leading to a failure. Once the edges are smooth, take a piece of emery cloth or medium-grit sandpaper and thoroughly clean the outer surface of the pipe, extending about 1-2 inches from the end. You need to remove all rust, paint, scale, and grime to create a smooth, clean surface for the fitting to seal against.

Videos for this step

Sand and Smooth Pipe EdgesClean and Deburr Pipe EndsInspecting the Pipe End

Tools and Materials

← Project

How to Replace a Section of Galvanized Pipe with PEX

Step 3 of 7·1.1 hr left

Plan and Gather Materials
30 mins7 itemsIntermediate
Cut and Remove Old Pipe
30 mins6 items
3
Prepare Pipe Ends
15 mins3 itemsIntermediate
4
Install Transition Fittings
15 mins5 itemsAdvanced
5
Measure and Cut PEX
10 mins5 itemsBeginner
6
Connect PEX Section
10 mins2 itemsIntermediate
7
Test for Leaks
15 mins3 itemsBeginner