Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 5 · Install the New Spout

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

Now, install the new spout. For a THREAD-ON spout, wrap the pipe's threads with 2-3 layers of Teflon tape in a clockwise direction (so it doesn't unravel as you tighten). Then, screw the new spout on by hand until it is snug and facing down. If it's not tight when facing down, give it another full turn. For a SLIP-ON spout, check if your new spout comes with a plastic adapter. If so, slide it onto the copper pipe first. Then, slide the new spout over the pipe until it sits flush against the wall. Ensure the set screw hole is facing down. Use your Allen wrench or screwdriver to tighten the set screw until it is snug. Do not overtighten, as this can dent the copper pipe.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 5 · Install the New Spout

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

Now, install the new spout. For a THREAD-ON spout, wrap the pipe's threads with 2-3 layers of Teflon tape in a clockwise direction (so it doesn't unravel as you tighten). Then, screw the new spout on by hand until it is snug and facing down. If it's not tight when facing down, give it another full turn. For a SLIP-ON spout, check if your new spout comes with a plastic adapter. If so, slide it onto the copper pipe first. Then, slide the new spout over the pipe until it sits flush against the wall. Ensure the set screw hole is facing down. Use your Allen wrench or screwdriver to tighten the set screw until it is snug. Do not overtighten, as this can dent the copper pipe.

Videos for this step

Apply Teflon Tape (for Screw-on Type)Secure the SpoutApply Teflon Tape

Tools and Materials

← Project

How to Replace a Leaky Bathtub Spout (Thread-on vs. Slip-on)

Step 5 of 6·10 min left

Prepare the Work Area
5 mins1 itemsBeginner
Identify the Spout Type
5 minsIntermediate
Remove the Old Spout
5 mins3 itemsAdvanced
Clean and Prepare the Pipe
5 mins2 itemsBeginner
5
Install the New Spout
5 mins4 itemsIntermediate
6
Seal and Test for Leaks
5 mins3 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.