This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

The final step is to check your work. Remove all tools and materials from the cabinet. Slowly turn the hot and cold water shutoff valves back on (counter-clockwise). Immediately inspect all connections for drips: where the supply lines meet the valves and where they connect to the faucet. If you see any drips, tighten the connection slightly. Next, place a bucket under the P-trap and fill both sink basins with water. Let them sit for a few minutes, checking the silicone seal around the sink rim for any leaks. Then, release the water and check the entire drain assembly and P-trap for leaks. Finally, turn on the power to the garbage disposal. Run water and turn on the disposal to ensure it operates correctly and there are no leaks from the vibration. Once everything is confirmed to be dry and working, clean up your tools and the work area.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 9 · Final Checks and Cleanup

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

The final step is to check your work. Remove all tools and materials from the cabinet. Slowly turn the hot and cold water shutoff valves back on (counter-clockwise). Immediately inspect all connections for drips: where the supply lines meet the valves and where they connect to the faucet. If you see any drips, tighten the connection slightly. Next, place a bucket under the P-trap and fill both sink basins with water. Let them sit for a few minutes, checking the silicone seal around the sink rim for any leaks. Then, release the water and check the entire drain assembly and P-trap for leaks. Finally, turn on the power to the garbage disposal. Run water and turn on the disposal to ensure it operates correctly and there are no leaks from the vibration. Once everything is confirmed to be dry and working, clean up your tools and the work area.

Videos for this step

Final Test and CleanupTest FaucetFinal Assembly and Leak Test

Tools and Materials

← Project

How to Install an Undermount Kitchen Sink

Step 9 of 9·30 min left

Preparation and Safety
30 mins4 itemsIntermediate
Disconnect Plumbing and Disposal
45 mins5 itemsAdvanced
Remove the Old Sink
1 min6 items
Clean the Countertop Surface
45 mins4 itemsAdvanced
Prepare the New Sink
45 mins8 itemsAdvanced
Mount and Support the Sink
30 mins6 items
Install Mounting Clips
1 min9 items
Reconnect Plumbing
1 min5 itemsAdvanced
9
Final Checks and Cleanup
30 mins3 itemsIntermediate