Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 7 · Connect Pipes to Box Valves

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Cut the PEX pipes extending through the box so they are the correct length to connect to the valve inlets. Slide a 1/2-inch copper crimp ring onto the blue (cold) PEX pipe. Push the pipe fully onto the cold valve inlet (typically on the right). Position the crimp ring 1/8 to 1/4 inch from the end of the pipe and use the PEX crimping tool to compress the ring until it's secure. Repeat the process for the red (hot) PEX pipe on the hot valve inlet (typically on the left). For the drain, cut the 2-inch PVC pipe to the proper length and use PVC primer and cement to glue it into the drain port on the outlet box.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 7 · Connect Pipes to Box Valves

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Cut the PEX pipes extending through the box so they are the correct length to connect to the valve inlets. Slide a 1/2-inch copper crimp ring onto the blue (cold) PEX pipe. Push the pipe fully onto the cold valve inlet (typically on the right). Position the crimp ring 1/8 to 1/4 inch from the end of the pipe and use the PEX crimping tool to compress the ring until it's secure. Repeat the process for the red (hot) PEX pipe on the hot valve inlet (typically on the left). For the drain, cut the 2-inch PVC pipe to the proper length and use PVC primer and cement to glue it into the drain port on the outlet box.

Videos for this step

Install Drain Adapter and Shutoff ValvesInstall New PEX PlumbingConnect to Main Water Lines

Tools and Materials

← Project

How to Install a Washing Machine Outlet Box

Step 7 of 8·35 min left

Plan and Locate the Box
15 mins3 itemsBeginner
Cut Wall Opening
15 mins4 itemsIntermediate
Install Support Framing
30 mins7 itemsAdvanced
Install Drain Line
60 mins10 items
Install Water Supply Lines
45 mins6 items
Mount the Outlet Box
10 mins4 itemsIntermediate
7
Connect Pipes to Box Valves
20 mins8 itemsAdvanced
8
Test for Leaks
15 mins3 itemsIntermediate
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.