Step 4 · Install Drain Line

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

This is a critical plumbing step. Locate the 2-inch PVC vertical drain stack you plan to connect to. Use a reciprocating saw or PVC pipe cutter to remove a section of the pipe where your new line will connect. Clean the cut ends. Apply PVC primer to the inside of a 2-inch PVC sanitary tee fitting and the outside of the pipe ends. Then, apply PVC cement over the primer and quickly push the pipe ends into the fitting with a quarter-turn motion to ensure a good seal. Run a new 2-inch PVC pipe from the sanitary tee to the outlet box location. Ensure the pipe has a constant downward slope of at least 1/4 inch for every foot of horizontal run to ensure proper drainage. You will likely need to install a P-trap assembly near the box connection point to block sewer gases, as per code.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Install Drain Line

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

This is a critical plumbing step. Locate the 2-inch PVC vertical drain stack you plan to connect to. Use a reciprocating saw or PVC pipe cutter to remove a section of the pipe where your new line will connect. Clean the cut ends. Apply PVC primer to the inside of a 2-inch PVC sanitary tee fitting and the outside of the pipe ends. Then, apply PVC cement over the primer and quickly push the pipe ends into the fitting with a quarter-turn motion to ensure a good seal. Run a new 2-inch PVC pipe from the sanitary tee to the outlet box location. Ensure the pipe has a constant downward slope of at least 1/4 inch for every foot of horizontal run to ensure proper drainage. You will likely need to install a P-trap assembly near the box connection point to block sewer gases, as per code.

Videos for this step

Run the Main Drain LineSolvent Welding and Connecting to Waste LineCut, Glue, and Install the Reducer Assembly

Tools and Materials

← Project

How to Install a Washing Machine Outlet Box

Step 4 of 8·2.5 hr left

Plan and Locate the Box
15 mins3 itemsBeginner
Cut Wall Opening
15 mins4 itemsIntermediate
Install Support Framing
30 mins7 itemsAdvanced
4
Install Drain Line
60 mins10 items
5
Install Water Supply Lines
45 mins6 items
6
Mount the Outlet Box
10 mins4 itemsIntermediate
7
Connect Pipes to Box Valves
20 mins8 itemsAdvanced
8
Test for Leaks
15 mins3 itemsIntermediate