Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 5 · Prepare for New Valve Installation

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Consult the new valve's instructions for the correct installation depth. This is crucial and is measured from the front of the valve to the face of the finished wall (tile or shower surround). Install a new piece of 2x4 lumber horizontally between the wall studs to serve as a secure mounting bracket for the new valve. Measure and cut the existing pipes as needed to align with the new valve's ports. Clean the outside of all pipe ends and the inside of your new fittings using a pipe cleaning brush and sand cloth until they are shiny and free of oxidation.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 5 · Prepare for New Valve Installation

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Consult the new valve's instructions for the correct installation depth. This is crucial and is measured from the front of the valve to the face of the finished wall (tile or shower surround). Install a new piece of 2x4 lumber horizontally between the wall studs to serve as a secure mounting bracket for the new valve. Measure and cut the existing pipes as needed to align with the new valve's ports. Clean the outside of all pipe ends and the inside of your new fittings using a pipe cleaning brush and sand cloth until they are shiny and free of oxidation.

Videos for this step

Access and Remove the Old Valve BodyInstall PEX Pipe to ValveInstall Valve Cartridge and Guard

Tools and Materials

← Project

How to Convert a 3-Handle Shower Faucet to a Single-Handle Valve

Step 5 of 9·4.7 hr left

Preparation and Safety
20 mins2 itemsBeginner
Create Wall Access
30 mins7 itemsAdvanced
Remove Old Faucet Trim
20 mins2 itemsIntermediate
Demolish Old Valve
45 mins3 items
5
Prepare for New Valve Installation
60 mins10 itemsAdvanced
6
Solder the New Valve
60 mins7 items
7
Test for Leaks
30 mins4 itemsIntermediate
8
Repair the Access Wall
90 mins11 itemsAdvanced
9
Install New Trim Kit
40 mins4 itemsIntermediate
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.