Step 4 · Install First Row of Planks

Start at the chosen wall. For nail-down or glue-down methods, ensure the tongue side of the plank faces away from the wall (if applicable). Use spacers between the first plank and the wall to maintain a consistent expansion gap (typically 1/4 to 1/2 inch). Fasten the first row securely, ensuring it is perfectly straight. If the first plank needs to be ripped lengthwise, ensure the cut edge faces the wall.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Install First Row of Planks

Start at the chosen wall. For nail-down or glue-down methods, ensure the tongue side of the plank faces away from the wall (if applicable). Use spacers between the first plank and the wall to maintain a consistent expansion gap (typically 1/4 to 1/2 inch). Fasten the first row securely, ensuring it is perfectly straight. If the first plank needs to be ripped lengthwise, ensure the cut edge faces the wall.

Videos for this step

Prepare and Install First Row (Straight Wall)Lay the First Row of PlanksLay First Row with Spacers

Tools and Materials

← Project

Hardwood Flooring Installation

Step 4 of 9·1.2 hr left

Acclimate Hardwood Flooring
72 minutes1 items
Prepare Subfloor
24 minutes7 items
Plan Floor Layout and Direction
3 minutes1 items
4
Install First Row of Planks
4 minutes3 items
5
Install Subsequent Rows
48 minutes9 items
6
Make Cuts for Obstacles and Edges
8 minutes6 items
7
Install Final Row
3 minutes7 items
8
Install Baseboards and Trim
6 minutes8 items
9
Clean Up
2 minutes4 items