Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 7 · Apply the Epoxy Coating

Once mixed, immediately begin applying the epoxy. Start by pouring a bead of epoxy along one edge of the floor or a designated starting point. Use a high-quality squeegee or roller designed for epoxy coatings to spread the material evenly. Work in manageable sections, maintaining a wet edge to avoid visible seams. For edges and corners, use a brush. Ensure consistent thickness across the entire surface.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 7 · Apply the Epoxy Coating

Once mixed, immediately begin applying the epoxy. Start by pouring a bead of epoxy along one edge of the floor or a designated starting point. Use a high-quality squeegee or roller designed for epoxy coatings to spread the material evenly. Work in manageable sections, maintaining a wet edge to avoid visible seams. For edges and corners, use a brush. Ensure consistent thickness across the entire surface.

Videos for this step

Apply Epoxy Base CoatApply Epoxy Base CoatApply 1st Epoxy Coat & Dry Overnight

Tools and Materials

← Project

Garage Floor Epoxy Coating

Step 7 of 10·8.6 hr left

Clean the Garage Floor
60 minutes2 items
Degrease the Concrete
120 minutes5 items
Repair Cracks and Pits
90 minutes3 items
Etch or Grind the Concrete
240 minutes9 items
Final Cleaning and Drying
180 minutes4 items
Mix the Epoxy Coating
20 minutes4 items
7
Apply the Epoxy Coating
180 minutes4 items
8
Apply Decorative Flakes (Optional)
45 minutes1 items
9
Allow Epoxy to Cure
168 minutes
10
Apply a Clear Top Coat (Optional)
120 minutes2 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.