Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 5 · Final Cleaning and Drying

After etching and rinsing, or after grinding and vacuuming, it's essential to ensure the floor is completely clean and dry. Use a wet vacuum to remove all residual water or dust. For etching, a final rinse with clean water may be necessary, followed by squeegeeing the water towards a drain or collection point. Allow the concrete to dry completely, which can take 24-72 hours depending on humidity and temperature. Use fans to accelerate drying if necessary.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 5 · Final Cleaning and Drying

After etching and rinsing, or after grinding and vacuuming, it's essential to ensure the floor is completely clean and dry. Use a wet vacuum to remove all residual water or dust. For etching, a final rinse with clean water may be necessary, followed by squeegeeing the water towards a drain or collection point. Allow the concrete to dry completely, which can take 24-72 hours depending on humidity and temperature. Use fans to accelerate drying if necessary.

Videos for this step

Remove Excess Water and DryPost-Grinding Cleaning and DryingAllow Floor to Dry and Test for Cleanliness

Tools and Materials

← Project

Garage Floor Epoxy Coating

Step 5 of 10·11.9 hr left

Clean the Garage Floor
60 minutes2 items
Degrease the Concrete
120 minutes5 items
Repair Cracks and Pits
90 minutes3 items
Etch or Grind the Concrete
240 minutes9 items
5
Final Cleaning and Drying
180 minutes4 items
6
Mix the Epoxy Coating
20 minutes4 items
7
Apply the Epoxy Coating
180 minutes4 items
8
Apply Decorative Flakes (Optional)
45 minutes1 items
9
Allow Epoxy to Cure
168 minutes
10
Apply a Clear Top Coat (Optional)
120 minutes2 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.