Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 2 · Clean the Surface

After removing the old caulk, clean the bathtub edge and surrounding tiles or wall with a bathroom cleaner or a solution of water and mild detergent. Use a scrub brush or sponge to remove any soap scum, mildew, or adhesive residue. Rinse the area thoroughly with clean water and allow it to dry completely. A clean and dry surface is crucial for proper adhesion of the new caulk.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 2 · Clean the Surface

After removing the old caulk, clean the bathtub edge and surrounding tiles or wall with a bathroom cleaner or a solution of water and mild detergent. Use a scrub brush or sponge to remove any soap scum, mildew, or adhesive residue. Rinse the area thoroughly with clean water and allow it to dry completely. A clean and dry surface is crucial for proper adhesion of the new caulk.

Videos for this step

Clean and Dry the Surface ThoroughlyRemove Old Caulk and Clean SurfaceClean and Prepare the Surface

Tools and Materials

← Project

Bathtub Caulking

Step 2 of 8·55 min left

Remove Old Caulk
30 minutes2 items
2
Clean the Surface
15 minutes2 items
3
Apply Painter's Tape
10 minutes1 items
4
Prepare the Caulk Tube
2 minutes2 items
5
Apply New Caulk
15 minutes1 items
6
Smooth the Caulk Bead
10 minutes3 items
7
Remove Painter's Tape
3 minutes1 items
8
Allow Caulk to Cure
0 minutes
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.