Skip to main content

Prepare Landing and Secure Stringers — Attach Stringers to Ground/Landing

Beginner2 mins

Part of project

How to Build Stairs for a Shed or Mobile Home · Step 6 of 7

Helpful?

In this video

To prepare a stable base for the stair stringers, first add sand beneath existing concrete pavers to achieve the correct height for the landing. Next, install a ledger board (an extension to the existing rim joist) to provide a secure attachment point for the stringers. The stringer locations should be marked on this ledger, and clearance holes should be drilled through the ledger and pilot holes into the stringers to avoid splitting the wood. Finally, temporarily attach the first stringer using a joist hanger, then permanently secure all four stringers to the ledger board using hex head lag screws, ensuring they are firmly in place. This foundational step ensures the entire staircase structure is stable and properly aligned.

2.5K views73
Transcript
Hide

Okay. Then you drop that back in there, would you? Sure. And Suzanne, if you put the string around here, now this is what's going to actually support the stairs. It's the bones of the stairs, if you would. Lin bought pre-cut stringers for this job. And while the pre-cuts make the job easier, they do require that the landing at the bottom of the stairs be at just the right height. In this case, we have to raise the landing, which is made of concrete papers, by adding sand underneath. And then what we need to do, in fact, is to make an extension to your rim joist there, kind of a ledger. Then we attach this assembly to the rim joist with rust-resistant screws. Now, I've marked the location of the stringers. Actually, we're going to use four of them in this stairway. One here, here, here, and here. The reason I've done that now is I'm going to be attaching this to the rim joist with carriage bolts, and I don't want those carriage bolts to be in the way of the stringers. Now it's time to attach the first stringer. And I've temporarily attached a joist hanger to the top of the stringer, which will hold it in place while we drill holes for lag screws. With everything properly positioned, I drill clearance holes through the rim joist and pilot holes in the end of the stringer. Okay, we're going to take this off now. Now I can remove the temporary joist hanger. Now I'm going to drill what's called a clearance hole. I want this to be able to slip right through this board here, and only bite into the stringer. Now we use a larger drill, yeah, I'm going to hold this up here, and you put it through. Next, we attach hex head lag screws. This will make the permanent attachment. This gives you a sense of accomplishment, satisfaction. You got us, Suzanne? Last one? Okay, great.

Auto-generated transcript. May contain errors.