Dig Trench for First Step — Mark and Excavate the Garden Stone Steps Area

Beginner7 mins

Part of project

How to Build Stone Steps in a Garden · Step 1 of 6

Helpful?

In this video

Excavate the marked area to create a trench for the first step. The depth of the excavation should be at least 12 inches to allow for adequate gravel base and proper embedding of the granite step. While digging, clay soil is encountered, which is noted as a solid and desirable base for stability. Continue digging until the desired depth and a relatively flat, solid base is achieved.

16.5K views619
Transcript
Hide

right. You can have a long handle. All right. I'll take the short. Take that. See that right there, Pete? I do. That's clay. Okay. Okay, so we're down to clay, which is solid stuff. Take this out. We still want to go a little bit deeper. How deep are we going to dig here? So, I normally like to go at least 12 in. Okay. Uh just cuz I want to get the gravel in for drainage.