Skip to main content

Install Balusters and Verify Spacing — Install Balusters

Beginner2 hours

Part of project

How to Measure Baluster Spacing and Handrail Height · Step 6 of 7

Helpful?

In this video

Carefully peel off the painter's tape from both the bottom shoe mould and the top handrail, revealing the pre-drilled holes. Begin installing the balusters. For the screw-down type balusters (like the single-rod style), position the baluster so its base aligns with the pre-drilled holes on the bottom shoe mould. Use a cordless drill with an appropriate bit to drive in the small screws (provided with the balusters) until they are secure. For the decorative square-shaped balusters, insert the bottom into its pre-drilled hole, then gently tap the top of the baluster into its corresponding hole on the handrail using a hammer or rubber mallet, ensuring a snug fit without damaging the wood or baluster finish. The presenter notes he's not fully securing all screws at this stage because he plans to remove the balusters later for staining, but describes the complete process. After installing the balusters, use a tape measure to confirm that the spacing between them complies with building codes (less than 4 inches).

91.1K views2.1K