Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings
Project video

Step 5 · Attach Mounting Brackets to Wall

Align the first mounting bracket over its pilot holes (or installed anchors). Insert the appropriate screws through the bracket holes and into the wall or anchors. Tighten the screws firmly with a screwdriver or drill, ensuring the bracket is securely fastened to the wall. Repeat for the second bracket.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 5 · Attach Mounting Brackets to Wall

Align the first mounting bracket over its pilot holes (or installed anchors). Insert the appropriate screws through the bracket holes and into the wall or anchors. Tighten the screws firmly with a screwdriver or drill, ensuring the bracket is securely fastened to the wall. Repeat for the second bracket.

Tools and Materials

← Project

Towel Bar Installation

Step 5 of 7·17 min left

Locate Wall Studs
5 minutes2 items
Mark Mounting Bracket Positions
5 minutes3 items
Drill Pilot Holes
5 minutes2 items
Install Drywall Anchors (If Necessary)
5 minutes2 items
5
Attach Mounting Brackets to Wall
10 minutes3 items
6
Attach Towel Bar to Brackets
5 minutes
7
Test Stability
2 minutes
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.