Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 2 · Prepare the Site

Remove any vegetation, rocks, or debris from the shed footprint. Ensure the ground is level. If the area is sloped, you may need to excavate and build up certain areas to create a flat base. Mark the perimeter of the shed location accurately using stakes and string lines.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 2 · Prepare the Site

Remove any vegetation, rocks, or debris from the shed footprint. Ensure the ground is level. If the area is sloped, you may need to excavate and build up certain areas to create a flat base. Mark the perimeter of the shed location accurately using stakes and string lines.

Videos for this step

Prepare the SiteSite Preparation and Foundation ExcavationPrepare the Site and Outline the Shed Base

Tools and Materials

← Project

Shed Construction

Step 2 of 12·47 hr left

Plan and Design the Shed
240 minutes4 items
2
Prepare the Site
180 minutes6 items
3
Build the Foundation
360 minutes10 items
4
Frame the Floor
240 minutes7 items
5
Frame the Walls
360 minutes10 items
6
Frame the Roof
300 minutes11 items
7
Install Roof Sheathing
240 minutes8 items
8
Install Roofing Felt and Drip Edge
180 minutes7 items
9
Install Shingles or Roofing Material
300 minutes9 items
10
Install Siding
360 minutes9 items
11
Install Door and Windows
180 minutes9 items
12
Finishing Touches
120 minutes5 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.