Step 3 · Mounting System Installation

Lay out the mounting system according to the design plans. Locate and mark roof rafters for secure attachment points. Drill pilot holes and install lag bolts or other specified fasteners to anchor the rails. Apply appropriate sealant around each penetration point to prevent water intrusion. Ensure the racking is level and properly spaced to accommodate the solar panels.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 3 · Mounting System Installation

Lay out the mounting system according to the design plans. Locate and mark roof rafters for secure attachment points. Drill pilot holes and install lag bolts or other specified fasteners to anchor the rails. Apply appropriate sealant around each penetration point to prevent water intrusion. Ensure the racking is level and properly spaced to accommodate the solar panels.

Videos for this step

Install Mounting RailsMounting Rail InstallationInstall Roof Mounting Brackets

Tools and Materials

← Project

Residential Solar Panel System

Step 3 of 7·46 min left

Site Assessment and System Design
8 minutes11 items
Permitting and Approvals
24 minutes6 items
3
Mounting System Installation
12 minutes10 items
4
Solar Panel Installation
8 minutes5 items
5
Electrical Wiring and Connections
16 minutes13 items
6
System Grounding
4 minutes5 items
7
Inspection and Commissioning
6 minutes3 items