Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 8 · Complete Submission Forms

Complete all the required forms that accompany the mold testing kit. This typically includes information such as your contact details, the location of the sampled areas, date and time of sampling, and any observations about moisture or odors. Accurate completion is crucial for the lab to process your results.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 8 · Complete Submission Forms

Complete all the required forms that accompany the mold testing kit. This typically includes information such as your contact details, the location of the sampled areas, date and time of sampling, and any observations about moisture or odors. Accurate completion is crucial for the lab to process your results.

Videos for this step

Complete Instruction Sheet and Obtain PINIdentify Sampling Locations and Submit to LabComplete Submission Form

Tools and Materials

← Project

Mold Testing Kit

Step 8 of 10·30 min left

Read Instructions
15 minutes1 items
Identify Test Areas
10 minutes
Prepare the Area
10 minutes1 items
Don Personal Protective Equipment (PPE)
5 minutes2 items
Collect Surface Sample
10 minutes1 items
Collect Air Sample (if applicable)
30 minutes1 items
Package Samples
5 minutes
8
Complete Submission Forms
15 minutes2 items
9
Mail Samples to Lab
15 minutes1 items
10
Receive and Interpret Results
0 minutes1 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.