Step 6 · Backfilling and Concrete Repair

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Once you have passed the inspection, you can close up the floor. First, carefully backfill the trenches with the gravel you previously set aside or new gravel. Surround the pipes completely and compact the gravel gently to ensure the pipes are fully supported and will not shift. Be careful not to damage the pipes with sharp rocks or excessive force. Lay down a vapor barrier (a sheet of plastic) over the gravel to prevent moisture from wicking up through the new concrete. Mix your ready-mix concrete according to the package directions in a wheelbarrow or a rented concrete mixer. Pour the concrete into the trenches, slightly overfilling them. Use a shovel or trowel to work the concrete around the pipes. Finally, use a straight piece of lumber (a screed board) in a sawing motion to level the new concrete patch flush with the existing basement floor. Let the concrete cure fully, which can take several days to a week before it's ready to be walked on or framed over.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 6 · Backfilling and Concrete Repair

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Once you have passed the inspection, you can close up the floor. First, carefully backfill the trenches with the gravel you previously set aside or new gravel. Surround the pipes completely and compact the gravel gently to ensure the pipes are fully supported and will not shift. Be careful not to damage the pipes with sharp rocks or excessive force. Lay down a vapor barrier (a sheet of plastic) over the gravel to prevent moisture from wicking up through the new concrete. Mix your ready-mix concrete according to the package directions in a wheelbarrow or a rented concrete mixer. Pour the concrete into the trenches, slightly overfilling them. Use a shovel or trowel to work the concrete around the pipes. Finally, use a straight piece of lumber (a screed board) in a sawing motion to level the new concrete patch flush with the existing basement floor. Let the concrete cure fully, which can take several days to a week before it's ready to be walked on or framed over.

Videos for this step

Backfill Trench and FinalizeBackfill Trench and Settle SoilBackfill and Level the Trench

Tools and Materials

← Project

How to Rough-In Plumbing for a Basement Bathroom

Step 6 of 6·4 min left

Planning, Layout, and Permitting
8 mins5 itemsAdvanced
Breaking and Trenching the Concrete
8 mins11 items
Installing the DWV System
6 mins14 items
Running Water Supply Lines
4 mins11 itemsAdvanced
Rough-in Inspection
2 mins3 itemsIntermediate
6
Backfilling and Concrete Repair
4 mins10 items