Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 7 · Test for Leaks and Final Cleanup

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

The final step is to check your work for leaks. Place a dry towel or paper towel under the entire drain assembly. Turn on the cold water and let it run for a minute, carefully checking every joint and connection point for drips. Then, turn on the hot water and repeat the process, as heat can sometimes expose a loose connection. For a thorough test, close the sink stoppers and fill both sink basins about halfway with water. Then, release the stoppers simultaneously to send a large volume of water through the new plumbing. Inspect carefully for any leaks. If you find a leak, it is likely at a slip nut connection; try tightening it another quarter-turn. Once you are confident there are no leaks, turn the circuit breaker back on. Clean up your tools, remove the bucket and towels, and return items to the cabinet.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 7 · Test for Leaks and Final Cleanup

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

The final step is to check your work for leaks. Place a dry towel or paper towel under the entire drain assembly. Turn on the cold water and let it run for a minute, carefully checking every joint and connection point for drips. Then, turn on the hot water and repeat the process, as heat can sometimes expose a loose connection. For a thorough test, close the sink stoppers and fill both sink basins about halfway with water. Then, release the stoppers simultaneously to send a large volume of water through the new plumbing. Inspect carefully for any leaks. If you find a leak, it is likely at a slip nut connection; try tightening it another quarter-turn. Once you are confident there are no leaks, turn the circuit breaker back on. Clean up your tools, remove the bucket and towels, and return items to the cabinet.

Videos for this step

Test InstallationTest Drain and Check for LeaksTurn Water On and Check for Leaks

Tools and Materials

← Project

How to Replace a Garbage Disposal and Install a Standard Sink Drain

Step 7 of 7·15 min left

Prepare the Work Area and Ensure Safety
15 mins3 itemsBeginner
Disconnect Plumbing Connections
20 mins4 itemsIntermediate
Remove the Garbage Disposal Unit
15 mins3 itemsAdvanced
Remove Old Mounting Assembly
20 mins5 itemsAdvanced
Install New Sink Strainer
25 mins3 itemsAdvanced
Assemble New Drain Plumbing
30 mins4 itemsAdvanced
7
Test for Leaks and Final Cleanup
15 mins4 itemsIntermediate
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.