Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 8 · Test for Leaks and Finalize

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

This is the moment of truth. Go back to the main shutoff valve and turn it on SLOWLY. This prevents a sudden surge of pressure (water hammer). Once the valve is fully open, return to the tub. With the access panel still open, use a powerful flashlight and a dry paper towel to meticulously inspect every connection you made: where the supply lines meet the valves, and where the valves and spout meet the tub deck. Check for even the smallest beads of water. Turn the faucet handles on to let water flow, which will pressurize all the connections, and check for leaks again. If a connection drips, turn the water off and tighten it slightly (about 1/8 of a turn) and re-test.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 8 · Test for Leaks and Finalize

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

This is the moment of truth. Go back to the main shutoff valve and turn it on SLOWLY. This prevents a sudden surge of pressure (water hammer). Once the valve is fully open, return to the tub. With the access panel still open, use a powerful flashlight and a dry paper towel to meticulously inspect every connection you made: where the supply lines meet the valves, and where the valves and spout meet the tub deck. Check for even the smallest beads of water. Turn the faucet handles on to let water flow, which will pressurize all the connections, and check for leaks again. If a connection drips, turn the water off and tighten it slightly (about 1/8 of a turn) and re-test.

Videos for this step

Turn on Water and Check for LeaksTurn on Water and Check for LeaksTurn Water On and Check for Leaks

Tools and Materials

← Project

How to Replace a Deck-Mount Garden Tub Faucet

Step 8 of 8·20 min left

Preparation and Water Shut-off
15 mins2 itemsBeginner
Access the Plumbing
10 mins1 itemsIntermediate
Disconnect Water Supply Lines
30 mins4 itemsAdvanced
Remove the Old Faucet Assembly
45 mins1 items
Clean the Mounting Surface
15 mins3 itemsBeginner
Install the New Faucet Components
30 mins3 itemsAdvanced
Connect Water Supply Lines
20 mins2 itemsIntermediate
8
Test for Leaks and Finalize
20 mins3 itemsIntermediate
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.