Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 2 · Mark the Pipe for Cutting

Precisely identify the location of the leak (it's often a small pinhole with mineral deposits). Measure your compression coupling to determine the length of the pipe section you need to remove. A standard 1/2-inch coupling requires about a 1-inch gap. Using a permanent marker, mark the pipe on both sides of the leak, ensuring the distance between your marks matches the required gap for your coupling. These marks will be your cutting guides.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 2 · Mark the Pipe for Cutting

Precisely identify the location of the leak (it's often a small pinhole with mineral deposits). Measure your compression coupling to determine the length of the pipe section you need to remove. A standard 1/2-inch coupling requires about a 1-inch gap. Using a permanent marker, mark the pipe on both sides of the leak, ensuring the distance between your marks matches the required gap for your coupling. These marks will be your cutting guides.

Videos for this step

Cut PipeCut the Leaking PipeCreate the PVC Patch

Tools and Materials

← Project

How to Repair a Leaking Copper Pipe with a Compression Coupling

Step 2 of 7·24 min left

Isolate and Drain the System
5 mins2 itemsBeginner
2
Mark the Pipe for Cutting
2 mins3 itemsBeginner
3
Cut Out the Damaged Section
5 mins3 itemsIntermediate
4
Clean and Deburr the Pipe Ends
5 mins3 itemsIntermediate
5
Assemble the Coupling on Pipe Ends
2 mins1 itemsBeginner
6
Install and Tighten the Coupling
5 mins2 itemsIntermediate
7
Restore Water and Test the Repair
5 mins2 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.