Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 3 · Mount the Air Switch Button

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

Take the air switch button assembly from your kit. Typically, it consists of the decorative button top, a gasket, the main body, and a retaining nut. Unscrew the retaining nut from the body. From the top of the sink, place the rubber or silicone gasket over the hole, then insert the main body of the air switch button through the gasket and the hole. From underneath the sink, thread the retaining nut onto the switch body and hand-tighten it. Use a pair of channel-lock pliers or the plastic wrench that may be included in the kit to give the nut a final quarter-turn to secure it firmly, being careful not to over-tighten.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 3 · Mount the Air Switch Button

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

Take the air switch button assembly from your kit. Typically, it consists of the decorative button top, a gasket, the main body, and a retaining nut. Unscrew the retaining nut from the body. From the top of the sink, place the rubber or silicone gasket over the hole, then insert the main body of the air switch button through the gasket and the hole. From underneath the sink, thread the retaining nut onto the switch body and hand-tighten it. Use a pair of channel-lock pliers or the plastic wrench that may be included in the kit to give the nut a final quarter-turn to secure it firmly, being careful not to over-tighten.

Videos for this step

Install and Secure Drain AssemblyInstall and Tighten New Drain AssemblyUnboxing and Component Overview

Tools and Materials

← Project

How to Install an In-Sink Air Switch for a Garbage Disposal

Step 3 of 6·35 min left

Preparation and Safety Check
15 mins2 itemsBeginner
Drill the Mounting Hole
30 mins10 itemsAdvanced
3
Mount the Air Switch Button
15 mins2 itemsIntermediate
4
Install the Power Control Module
5 mins2 itemsBeginner
5
Connect Disposal and Air Tube
10 minsBeginner
6
Final Test
5 mins2 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.