Step 5 · Install Water Supply and Valve Covers

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

Now, take the two smaller shield pieces intended for the water supply lines. Identify the hot water line (usually on the left). Wrap one shield piece around the hot water supply pipe and the corresponding angle stop. Secure it tightly using its hook-and-loop fasteners. The cover should fully insulate the pipe and valve body but allow the handle to be turned. Repeat the exact same process for the cold water supply line on the right. Adjust the positioning of both covers to ensure there are no gaps and the coverage is complete and neat.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 5 · Install Water Supply and Valve Covers

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

Now, take the two smaller shield pieces intended for the water supply lines. Identify the hot water line (usually on the left). Wrap one shield piece around the hot water supply pipe and the corresponding angle stop. Secure it tightly using its hook-and-loop fasteners. The cover should fully insulate the pipe and valve body but allow the handle to be turned. Repeat the exact same process for the cold water supply line on the right. Adjust the positioning of both covers to ensure there are no gaps and the coverage is complete and neat.

Videos for this step

Measure PipesSecure and Insulate PipesConnecting Water Supply Lines

Tools and Materials

← Project

How to Install an ADA-Compliant Under-Sink Plumbing Shield

Step 5 of 6·15 min left

Prepare Work Area and Safety Precautions
5 mins4 itemsBeginner
Measure and Plan Layout
10 mins3 itemsIntermediate
Trim the Shield to Fit
10 mins3 itemsAdvanced
Install the Main Drain (P-Trap) Cover
5 mins1 itemsIntermediate
5
Install Water Supply and Valve Covers
10 mins1 itemsIntermediate
6
Final Inspection and Cleanup
5 mins2 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.