Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 6 · Turn on Water and Check for Leaks

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

This is the most critical step. First, ensure the filter cartridge is NOT yet in the housing. Close the two ball valves leading to the filter and open the ball valve on the bypass loop. Make sure all faucets in the house are still closed. Go to the main shutoff valve and turn it on very slowly, allowing the pipes to fill with water gradually. Listen for the sound of rushing water to stop. Go back to the filter assembly and meticulously inspect every single joint and fitting for drips. Use a flashlight and a dry paper towel to wipe each connection and check for moisture. If you find a leak, shut off the water and tighten the leaking fitting slightly. Once the bypass is confirmed leak-free, close the bypass valve and slowly open the inlet and outlet valves to the filter housing. Again, check all connections around the filter housing for leaks.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 6 · Turn on Water and Check for Leaks

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

This is the most critical step. First, ensure the filter cartridge is NOT yet in the housing. Close the two ball valves leading to the filter and open the ball valve on the bypass loop. Make sure all faucets in the house are still closed. Go to the main shutoff valve and turn it on very slowly, allowing the pipes to fill with water gradually. Listen for the sound of rushing water to stop. Go back to the filter assembly and meticulously inspect every single joint and fitting for drips. Use a flashlight and a dry paper towel to wipe each connection and check for moisture. If you find a leak, shut off the water and tighten the leaking fitting slightly. Once the bypass is confirmed leak-free, close the bypass valve and slowly open the inlet and outlet valves to the filter housing. Again, check all connections around the filter housing for leaks.

Videos for this step

Turn On Water and Test SystemTurn On Water and Flush SystemSystem Flushing and Leak Check

Tools and Materials

← Project

How to Install a Whole-House Sediment Water Filter

Step 6 of 7·35 min left

Plan and Prepare
30 mins3 itemsBeginner
Shut Off Water and Drain Pipes
15 mins1 itemsIntermediate
Measure and Cut the Main Water Line
30 mins4 items
Assemble the Filter and Bypass Loop
60 mins11 itemsAdvanced
Install the Filter Assembly
30 mins3 items
6
Turn on Water and Check for Leaks
20 mins3 itemsAdvanced
7
Install Filter Cartridge and Flush System
15 mins3 itemsIntermediate
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.